Before you install any flooring material over a concrete slab it is important to inspect the slab for defects.
Installing vinyl plank flooring on concrete slab.
The moisture levels in concrete subfloors should be as low as possible before installing vinyl flooring.
A concrete floor seems like the perfect base for a vinyl floor installation.
Today i m sharing some tips tools and tricks to installing vinyl plank over concrete.
Then use a level to find any spots where the ground is uneven and apply concrete self leveling compound to even it out.
Wash the concrete floor thoroughly using water and household detergent or degreaser.
Vinyl plank installation on concrete makes the floor warm and comfortable.
Vinyl plank is designed to connect through click and lock and glue down techniques.
If moisture is less of an issue for your concrete slab you may consider luxury vinyl tiles or planks.
How to install vinyl plank flooring.
A concrete floor with a too high moisture content can wreak havoc on a vinyl floor.
For installation of vinyl flooring you need a smooth even surface for the underside of the flooring to achieve the best contact for adhesion.
This is the second time we ve done our concrete basement using vinyl plank flooring see the last place here and this time it went so much smoother.
If you have some experience with installing flooring or are diy hobbyist it shouldn t take you more than a day to install vinyl plank flooring on concrete.
As much as this flooring material may seem to be a perfect flooring it would be prudent to consider vinyl plank flooring pros and cons.
In addition to its affordability vinyl flooring offers temperature benefits for basement installation.
And then baseboard is another leap forward it s so exciting.
Vinyl planks can withstand damp concrete basement floors and look gorgeous at the same time.
The floor should be free of greasy spots or built up grime before you leave it to fully dry.
Dips bulges and cracks occur frequently as concrete cures and ages.
Conduct a moisture test.
Vinyl plank flooring is water resistant and if it has a wpc core it s waterproof so it won t be damaged by the off gassing.
Newly poured concrete off gases water vapor and typically needs from 120 to 150 days to dry out before it s ready to accept flooring according to milliken company.
It is one of the cheapest solutions and at the time of writing it could set you back just a few hundred bucks depending on the size of the area you are covering.