Normally size of test vents and drains shall be.
Hydrostatic vents and drains.
Vents and drains shall be closed with a blind flange or a threaded cap plug as provided in the relevant piping class.
But it will be vary depends on the fluid project and client.
An in line sewer video camera is used in the process to assist with the placement of test balls throughout the system and to map out the layout of the sanitary sewer system.
Ensure that equipment such as compressors which must not be included in the field tests have been properly blocked off with the casing drain open.
Drain note 1 note 3 note 1note 3 note 1 note 2 note 2 note 2 or t i on top of pip e pipin g h yd r o test ven ts an d d r a in s typic al lo c ation a p p lic a b l e t o a ll p ip in g s u b je c t t o h yd r os t a t ic le a k t e s t.
Purpose of hydro high point vents is to expel air during hydro test.
Pnf0307 v d 07 hydrostatic test vents and drains welded piping nps 2 and up with pipets and lap joint flanges.
1 for line size 16 and larger.
Pnf0309 v d 09 hydrostatic test vents and drains welded piping nps 2 and up with weldolet and flanges.
Hydro testing required that all air must be expelled and pipe must be completely and absolutely fill with water.
After hydro test is done pipe is drained thru low points drains by gravity.
Check open and closed position of all valves.
Verify chloride content of test water when testing stainless steels.
For line size up to 14.
On the other hand there are hydro vents and drains which function is to provide proper hydro testing and pipe draining.