To prepare a concrete subfloor for installing tile you ll need to do a different kind of preparation.
How to level concrete subfloor for tile.
Stir ready to use floor patching compound with a paint stirring stick.
Additionally a steps must be taken to ensure that a concrete floor will create a solid bond.
Typically the floor must be level and uniform within 3 16 inch every 10 feet.
Use a long level and tape measure to check that the floor is level.
Test by sprinkling water on various areas of the subfloor.
In order to level the subfloor to install tile the builder suggests 1 to put a paper on plywood and pour self leveler and skip hardibacker.
Preparing your subfloor for tile in this video learn how to prepare a wood or concrete subfloor for tile including such steps as checking for dips installing backerboard applying primer and thinset pouring liquid underlayment and when to use osb or exterior grade plywood.
Tile leveling systems can help keep your tiles level aligned properly spaced and held in place while the tile mortar cures.
For a successful installation the concrete floor beneath the tile needs to be.
Used correctly tile leveling systems.
If you want to install vinyl tile or ceramic tile things get a bit trickier.
As with a wooden subfloor a concrete subfloor must be level for successful tile installation.
Pass a carpenter s level across the surface of the concrete floor to check for levelness.
If you are installing a locking or floating floor not attached to the subfloor just make sure that the subfloor is clean.
To prepare your concrete subfloor make sure that it can accept water penetration.
Leveling a concrete floor for tile.
And 3 grind the hump of the plywood.
Mark high and low spots.
Self leveling underlayment products can be used on concrete floors wood subfloors that are uneven but still in decent shape and even over ceramic tile floors eliminating the task of tearing.
2 to pour self leveler on plywood directly and skip hardiback.