The shingles should be no more than five eighths of an inch apart.
How to build a wooden shingle roof.
Cover the roof with roofing felt.
Watch and see how easy it is.
Many pros shingle in a vertical line up the roof because it s much faster.
Use sticky back ice and water shield as underlayment where ice dams or leaf and twig dams are likely to build up and at.
For this project you will need.
Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across.
Nail metal flashing called drip edge along the bottom edge of the roof deck near the gutters.
Shingling a shed and want some tips.
Roofing felt drip edge shingle.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Handy home shows you universal shingling techniques that can be applied to any shed.
Starting at the bottom of the roof map out a guideline with chalk.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
Position the first shingle so its end overhangs the edge of the roof by 1 1 4 to 1 1 2 inches.
Use a hammer stapler to fasten it down applying a staple every 12 to 14 inches.
When you install wood shake roof shingles place one shingle on the left of your guide line and a second shingle on the right side.
Use a roofing nail 1 to tack the drip edge down one every 10 when placing two pieces of drip edge together overlap one end over the other by 1 and secure using two roofing nails one in the back and one in the front.
Secure it to the.
The tools you ll need to split the shingle from the bolts include a froe metal wedge 8 12 long with an eye in one end to hold a handle and a wooden mallet made of hardwood with a knot for.
If your eave is one straight length then pick an end and work to the other.