Place nails 2 to 3 in.
How to attach a staggered roof.
Up from the bottom of the eave.
To do this select shakes that are wide enough to span the seams between two shakes below which provides prevention from water intrusion similar to shingles on a roof.
Here there are you can see one of our attaching a roof to an existing roof collection there are many picture that you can browse do not miss them.
This flashing is typically field fabricated from a sheet of 26 ga.
If you aren t a skilled carpenter some studying can be concerned akin to how you can design an a frame roof or how to construct a wall.
Many pros shingle in a vertical line up the roof because it s much faster.
At hips and valleys.
Generally the whole frame is preassembled and all you.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Galvanized sheet metal bent at a 90 degree angle i e.
Here is a video about roofing underlayment.
The roof is chalked for 20 inch slates with added headlap 4 inches instead of 3 inches or chalk lines every 8 inches.
Position them so the adhesive strip is toward the bottom and facing up.
Stagger a shake downward a.
The first is to use slates all of one length say 20 inch.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
I want to be.
How to install roofing underlayment the proper way.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Run the row of starter shingles 1 2 in.
Subscribe and share please.
Past the drip edge.
Check this out.
The treatment at valleys depends much on the formation but the same rules apply in that the ends should be angled supported and securely fixed.
Posted march 4 2017 filed under roof installation roof repair maintenance.
Water can get in the seams between any two shingles but that s ok because shingles overlap and the seams are staggered.
Bent into an l shape.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
At the hips the batten ends should be cut to an angle be fully supported by the hip rafter or timber noggins and securely nailed.