Apply about two inches worth of cement under either side to seal the roofing down and then nail it down making sure it still stays flat and even as you go.
How to apply rolled roofing finish.
When compared to shingles rolled roofing is far cheaper and much easie.
Extend the front edge of the drip edge so it runs off the roof and into the.
Overlap the next strip of roofing material with the first by at least 4 inches.
Mark a chalk line to identify the end of your first layer.
Use 1 inch nails for new roofing.
Installing the rolled roofing 1.
Check the sheathing for any nails or screws that may be.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
Use 1 nails for re roofing.
To seal a plumbing vent spread roofing.
Cut the rolled roofing.
Continue to attach the material with nails every 3 inches.
Using a measuring tape measure 35 inches 89 cm up from.
Roll out the first sheet and ensure that it lies flat and even.
Make sure the roofing material is laying flat with no bumps or wrinkles attach the upper edge with the large head.
How to do it attach first course.
2 like any other roof project you should start this one by addressing the valleys.
Spread the roofing cement along the.
Clean the roof with a broom to remove any debris.
Step 6nail the first course match the overhang to the overhang of the starter strip 1 4 to 3 8 from the drip edge.
Use a 6 inch swath of roofing cement to attach the ends of your strips of roll roofing to the roof itself.
Enlist the help of one or two helpers to handle the long strips.
Valleys will be open so flash them before hand with metal or two layers of roll roofing the first an 18 inch wide strip and the second 36 inches wide.
10 easy steps for diy rolled roofing installation 1 spend some time cleaning the roof before beginning a rolled roofing installation project.
This will help to protect the subsurface.
Apply roofing cement to the roof.
Use a trowel to scoop up the roofing cement.
Attach drip edge along the edge of the roof with roofing cement.
Apply rolled roofing rolled roofing has become more and more popular in recent years.
Align the roofing with the chalk line and nail down the edge that runs along the drip edge working out any bubbles as you go.
The roofing should extend 1 inch beyond the drip edge.
Plan so that no two butt joints are closer than 2 feet from each other.
They are long enough to penetrate the sheathing.