Roof sheathing attaches to the surface of the rafters or trusses to form the structural skin of the roof.
How should roof sheathing be installed at peak.
Position the first piece of plywood.
Too little can allow water to seep into rake or fascia boards.
How to install roof sheathing 1.
Ventilate the roof according to current building codes step 3.
Start the sheathing at the eaves and work your way up to 1 inch from the peak.
The last course at the top may need to be rip cut if the roof is not in 4 foot increments.
When installing roof sheathing use nails with longer nail shank larger diameter and a larger head than may be required.
How to correctly install plywood or osb roof sheathing.
How should the sheathing meet at the roof peak when there will be no ridge vent.
The fasteners should be spaced only 4 inches apart on the panel edge at the gable end wall framing.
The edge of the shingles should hang over a roof between an inch and an inch and a half or between a half inch and three quarters of an inch if drip edge flashing is installed.
Properly fasten panels including fastening and spacing hints step 4.
Cover sheathing with.
And scroll down to see more details on each with installation hints and tips below.
It spans the rafters to support the roofing and in the case of panel sheathing such as plywood or osb it acts as a diaphragm with the walls to resist horizontal loads.
Too much overhang and the shingles could blow off in high winds.
This is a simple pitched roof line with ridge beam and rafters attached with slope hangers.
It is important here that the sheathing at the eave line be exactly perpendicular to the rafters so that the sheets will meet at the centers of the rafters.
Begin applying the sheets from the bottom of the roof the eaves and work your way up to the ridge.
Measure from the peak of the roof along each rafter on one side of the roof to determine the exact length of each.
Leave a slight gap as if the sheathing was cut a little short and install the sheathing to a matching edge no gap.
Nails size 8b should be installed every 6 inches on edges and every 12 inches in the center area.
Cut each rafter tail on the chalk line with a circular saw to ensure that every rafter is the same length.
I have seen two thoughts.
Install sheathing perpendicular to roof trusses one slope at a time.